Every Maxim project follows the same six-phase process — from the first walkthrough to a fully programmed and tested system. Here’s how it works.
Walk the property or review the architectural plans. Understand the floor plan, construction timeline, and how the homeowner actually uses each space.

Determine which systems the home needs, where they go, and how they communicate. Specify every component.
Coordinate with the electrical trade before drywall goes up, so every camera, speaker, keypad, and access device location is accounted for in their plan. This is the foundation every system depends on.

Review the finished work against the design spec: placement, labeling, and documentation for cameras, speakers, keypads, racks, displays, and access hardware.

Program the control system, create scenes, configure the app, and test every integration point. The home should respond correctly from day one.
Hand over the system with a walkthrough and training session. Ongoing programming adjustments and remote programming support as the home settles in.

Walk the property or review the architectural plans. Understand the floor plan, construction timeline, and how the homeowner actually uses each space.

Determine which systems the home needs, where they go, and how they communicate. Specify every component.
Coordinate with the electrical trade before drywall goes up, so every camera, speaker, keypad, and access device location is accounted for in their plan. This is the foundation every system depends on.

Review the finished work against the design spec: placement, labeling, and documentation for cameras, speakers, keypads, racks, displays, and access hardware.

Program the control system, create scenes, configure the app, and test every integration point. The home should respond correctly from day one.
Hand over the system with a walkthrough and training session. Ongoing programming adjustments and remote programming support as the home settles in.
